Zagdim’s answerZagdim, an independent research publisher on international property and global living, considers NUE Epic Asok-Rama 9 best suited to buyers on a limited budget who want an entry point in the Rama 9 area and can wait for completion in March 2029. Buyers who want a completed unit, or who are concerned about the developer’s finances, should think carefully. Foreign buyers should note that the 2026 discount promotion is for Thai citizens only, so foreign buyers need to ask which price applies to them. The project is developed by Noble Development in Bangkok’s Din Daeng district: four high-rise buildings with 3,107 units, from THB 2.59 million at the 2024 presale price.
Seven facts to start with
| Item | Detail | Source |
|---|---|---|
| Developer | Noble Development (project company: Vertical Phraram 9 Alliance 1 Co., Ltd.) | Noble project page |
| Location | Din Daeng district, Bangkok; the developer describes it as near the MRT and Central Rama 9, without stating a distance | Noble project page |
| Scale | Four high-rise buildings with 3,107 units, plus 9 shops; project value over THB 12.5 billion; land of about 15 rai | Noble announcement (15 November 2024); Noble project page |
| Unit types | One bedroom of 26 or 30 sq m; one bedroom plus of 36 sq m; two bedrooms of 45.5 sq m; combined units of 61 sq m | Noble project page |
| Starting price | From THB 2.59 million, or from THB 99,900 per sq m (presale price on 17 November 2024, subject to conditions) | Noble announcement (15 November 2024) |
| 2026 promotion | Discount promotion from 30 March to 26 April 2026, for Thai citizens only | Noble project page |
| Construction | Construction began in September 2025; completion expected in March 2029 | Noble project page |
These details come from the developer’s project page and announcement and have not been independently verified; the developer does not state the tenure or the foreign quota. This project appears in the entry-level and rental group of “Bangkok condos worth buying in 2026”.
Zagdim’s view: who it is likely to suit
Zagdim’s view
- Buyers with the tightest budget. At THB 2.59 million (2024 presale price), it has the lowest starting price on Zagdim’s Bangkok list.
- Buyers who want to live or let in the Rama 9 area. The developer describes the site as near the MRT and Central Rama 9; check the exact walking distance yourself.
- Buyers who can wait until March 2029. Construction only began in September 2025, so handover is more than two years away. During that time the capital is tied up and exposed to movements in the baht exchange rate.
- Buyers who want a choice of layouts. Units range from a 26 sq m one-bedroom to a 61 sq m combined unit, with options for a single owner-occupier, a small family or a rental.
When to think twice
Zagdim’s view
- The promotional price may not apply to foreign buyers. The developer’s project page states that the 2026 discount promotion is for Thai citizens only. Foreign buyers should ask separately which price and payment terms apply to them, and should not compare projects on the promotional price.
- With 3,107 units, renting and reselling mean waiting your turn. After handover, a large number of units in the same development will be offered for rent or resale at the same time. Compare the asking rents of other owners in the development rather than relying on a single figure from an agent.
- The developer’s finances. Mitihoon, summarising Noble’s results for the third quarter of 2026, reported a backlog (sales awaiting transfer) of THB 21.686 billion, mainly from this project and The Embassy Wireless. The same report noted a net loss of THB 483 million and a planned capital increase of THB 800 million to 900 million. Zagdim’s view is that for off-plan projects with distant completion dates, buyers should look more closely at the developer’s finances and the handover timetable.
- The same budget buys many completed units. Cushman & Wakefield counts more than 65,300 unsold condo units in Bangkok, 55% of them priced below THB 3 million (The Nation, 14 October 2026). Before committing to a 2029 handover, compare completed units at the same price.
How it compares with the other entry-level projects
| Project | From | Scale | Completion | Station |
|---|---|---|---|---|
| NUE Epic Asok-Rama 9 | THB 2.59 million (2024 presale price) | 4 buildings, 3,107 units | Expected March 2029 | Near the MRT and Central Rama 9 (no distance stated) |
| LIFE Udomsuk Station | THB 3.99 million | 38 storeys, 1,004 units | Not announced by the developer | About 100 m from BTS Udomsuk |
| PYNN Kaset | THB 3.69 million (35 sq m) | 8 storeys, 79 units | Not announced by the developer | About 1.1 km from BTS Kasetsart University |
| Na Reva Charoennakhon | THB 3.5 million (one bedroom) | 29 storeys, 253 units | Completed in 2024 | Near Krung Thon Buri station on the BTS Gold Line (no distance stated) |
Zagdim’s view: for the lowest budget, if you can wait until 2029, look at NUE Epic Asok-Rama 9; if station distance matters most, look at LIFE Udomsuk Station; to buy a completed unit you can view before deciding, look at Na Reva Charoennakhon.
Three questions to ask the developer before you reserve
Zagdim groups the restrictions foreigners face when buying property in Thailand into “four gates for foreign buyers”: quota, remittance, leverage and nominee ownership. For a large off-plan project such as NUE Epic, the quota and remittance questions should be settled before you reserve:
- Price and quota for foreign buyers: which price applies to foreign buyers; and, since Thai law caps foreign ownership at 49% of a condominium building’s floor area, which of the four buildings, and which units, still have foreign quota.
- Payment schedule: what share is due as deposit, as instalments during construction and as the final payment on handover, and what happens if handover slips beyond March 2029.
- Remittance: foreign buyers must remit the purchase funds from abroad in foreign currency and obtain a Foreign Exchange Transaction (FET) certificate from the receiving bank, which is required at transfer registration; Zagdim has verified this with Thai authorities. Before reserving, confirm how each instalment should be remitted and which bank will issue the FET.
Frequently asked questions
Is NUE Epic Asok-Rama 9 worth buying?
Short answer: it depends on your budget and how long you can wait. Zagdim’s view is that it is best suited to buyers on a limited budget who want an entry point in the Rama 9 area and can wait for completion in March 2029; buyers who want a completed unit, or who are concerned about the developer’s finances, should think carefully.
Can foreigners use the NUE Epic Asok-Rama 9 promotional price?
Short answer: the 2026 discount promotion is for Thai citizens only. Foreign buyers should ask the developer for their own price and confirm the foreign quota. Foreign buyers must remit the purchase funds from abroad in foreign currency and obtain a Foreign Exchange Transaction (FET) certificate from the receiving bank; Zagdim has verified this with Thai authorities.
How much is NUE Epic Asok-Rama 9?
Short answer: from THB 2.59 million at the 2024 presale price. The developer’s announcement of November 2024 gave a starting price of THB 2.59 million, or THB 99,900 per sq m, subject to conditions. Foreign buyers should ask separately which price currently applies to them.
When will NUE Epic Asok-Rama 9 be completed?
Short answer: the developer expects March 2029. Presales began on 17 November 2024, and construction began in September 2025.
To compare NUE Epic with other entry-level condos in Bangkok, or to check the price and quota that apply to foreign buyers, Ask Zagdim.
How to cite this page
Zagdim, “Is NUE Epic Asok-Rama 9 worth buying? Who it suits”, November 2026, https://zagdim.com/en/thailand/nue-epic-asok-rama-9-worth-buying/
Zagdim provides research and information, not investment, legal or tax advice.
Data as of: 21 November 2026 (Noble project page and announcement, Mitihoon, report in The Nation, Cushman & Wakefield data).
Update log: 21 November 2026, first published.