Updated: 2026-11-21
Compiled from public information; not yet confirmed by the developer. This page is not advertising: the developer did not pay for it or take part in writing it.
Zagdim’s answerZagdim, an independent research publisher on international property and global living, considers Berkeley a financially sound listed developer that specialises in large London regeneration schemes, with a delivery record that is reliable overall. In recent years, however, it has been drawn into building-safety remediation claims on older blocks, and its new London buildings are taking longer to complete, so overseas buyers purchasing off-plan should first be clear about the handover date. Berkeley was founded in 1976, delivered 4,076 homes in its 2026 financial year and held net cash of £360 million at the year end.
Company at a glance
| Item | Detail | Source |
|---|---|---|
| Company | Berkeley Group Holdings plc, listed on the London Stock Exchange; moved from the FTSE 100 to the FTSE 250 index from 22 June 2026 | FTSE Russell index review (June 2026) |
| Founded | 1976, by Tony Pidgley and Jim Farrer in Weybridge, Surrey; full listing on the London Stock Exchange in 1985 | Berkeley company history page |
| Main market | London and the South East of England; current executive chair Rob Perrins | Berkeley 2026 full-year results (24 June 2026) |
| 2026 financial year (to 30 April) | Revenue £2.38 billion; pre-tax profit £450 million; 4,076 homes delivered | As above |
| Land holdings | 59 developments, land for 52,763 homes | As above |
| Building-safety remediation | Signatory to the UK government’s Developer Remediation Contract | GOV.UK list of signatories (updated 12 October 2026) |
Financial figures are taken from Berkeley’s results announcement; remediation data is compiled by the government and self-reported by developers.
Scale and finances
In its 2026 financial year, Berkeley’s revenue was £2.38 billion, slightly below the previous year’s £2.49 billion. Pre-tax profit was £450 million, it delivered 4,076 homes (4,047 the year before) and it held net cash of £360 million at the year end. Its land holdings cover 52,763 homes, on which the company estimates a future gross margin of about 24.4%.
The other side of the picture is a slowdown. Construction Enquirer reported in April 2026 that Berkeley would largely stop buying new land and concentrate on building out its existing holdings of about 50,000 homes. After the June index review, Berkeley moved from the FTSE 100 to the FTSE 250. Zagdim’s view: the company is not under debt pressure, so the risk of construction stopping because of financial trouble is low in the near term. What is slowing is the start of new schemes, not the delivery of homes already sold.
Berkeley’s best-known projects are large London regeneration schemes. Royal Arsenal Riverside in Woolwich has about 4,000 homes completed and more than 5,000 expected in total (see Is Royal Arsenal Riverside in Woolwich worth buying?). Woodberry Down in Hackney received approval for a new masterplan in October 2025, raising the total to 6,500 homes. Kidbrooke Village and White City Living are also long-running Berkeley schemes.
Delivery and quality record
The Home Builders Federation (HBF) publishes customer satisfaction star ratings each year; developers take part voluntarily. The published 2026 results (covering buyers who moved in between October 2024 and September 2025) do not list Berkeley, so it cannot be described as a developer with a particular star rating.
In its results announcement, Berkeley cites HBF data from March 2026: 90% of Berkeley new homes had five or fewer defects at handover, against an industry average of 31%. This is a figure the company itself quotes. It points in a positive direction, but it is not the same measure as the published HBF star rating.
Handover timing is the other key issue. Executive chair Rob Perrins told Building in June 2026 that completing an apartment block in London now takes at least 8 years. Property Week, in March 2026, also quoted Berkeley as saying that early approvals by the Building Safety Regulator (BSR) had slowed the supply of new London homes. Berkeley made these comments to criticise policy, but the message for buyers is clear: for London high-rise buildings that have not started, or have only just started, handover may take longer than expected.
Building-safety remediation and regulatory record
- Remediation contract: Berkeley has signed the UK government’s Developer Remediation Contract, committing to address life-critical fire-safety defects in residential buildings over 11 metres that it built in England over the past 30 years. Government data to 31 January 2026 shows 825 Berkeley buildings within the contract, of which 81 require Berkeley to carry out remediation itself: 54 have started or completed works (42 completed) and 27 have not started. A further 722 were assessed as not requiring remediation; this assessment is the developer’s own.
- Empire Square remediation ruling: on 5 June 2025, the First-tier Tribunal (Property Chamber) in England ruled that Berkeley Group Holdings plc must pay about £9.69 million in remediation costs for Empire Square in London SE1, plus about £1.23 million for fire-patrol (waking watch) costs.
- Lendlease claim: Construction News reported in September 2026 that Lendlease has brought a £95.8 million High Court claim against Berkeley over 20 former Crosby projects. Berkeley declined to comment. The case has not yet been decided.
- Competition and Markets Authority (CMA) investigation: in February 2024 the CMA opened an investigation into the exchange of commercially sensitive information among large housebuilders; Berkeley was one of seven housebuilders investigated. On 30 October 2025, the CMA closed the case after accepting commitments under which the housebuilders together paid £100 million into affordable housing programmes. It made no finding of an infringement, and the housebuilders did not admit wrongdoing.
Zagdim’s view: the remediation disputes mostly concern older blocks from the 2000s and mainly affect the owners of those blocks. For buyers of new Berkeley homes, the new buildings are approved under a stricter building-safety regime, and the main risk lies in handover timing.
Who a Berkeley new-build is more likely to suit
Zagdim’s view
- Buyers looking for completed or nearly completed homes in a large development. Berkeley’s strength is multi-phase regeneration schemes where amenities develop over time; phases that are already occupied can be visited in person first.
- Overseas buyers who put weight on a developer’s financial strength. As a listed company with net cash, Berkeley publishes financial information every year, which is easier to verify than for a private developer.
- Off-plan buyers who are in no hurry to move in and can accept a variable handover date. Approval and construction periods for London high-rises have lengthened, so payment and funding plans need room for flexibility.
Questions to ask before you reserve
Zagdim’s view
- The expected handover date for the phase, and what the contract says if handover is delayed. For buildings that have not yet started, ask whether they have passed Building Safety Regulator approval.
- Building height and fire-safety design. Residential buildings over 11 metres fall under the new building-safety regime; ask about the fire and evacuation design and who will be responsible for building management.
- Service charges and estate charges. Large developments have many shared facilities; ask for written information on how the annual service charge is calculated and how much it has changed in recent years.
- Independent checks by your own agent or solicitor. Non-residents buying residential property in England pay a stamp duty surcharge, so work out the total cost before you reserve (see Which London new-build homes are worth buying in 2026?).
Frequently asked questions
Is Berkeley a reliable developer?
Short answer: on its finances and delivery record, reliable overall. Zagdim’s view is that Berkeley is a listed developer with net cash that delivers about 4,000 homes a year. The points to watch are remediation claims on older blocks and longer handover times for new London buildings.
Is Berkeley an HBF five-star housebuilder?
Short answer: the published 2026 HBF star ratings do not list Berkeley. Taking part in the HBF survey is voluntary. Berkeley separately cites HBF data showing that 90% of its new homes had five or fewer defects at handover.
Which London developments has Berkeley built?
Short answer: mainly large regeneration schemes. Examples include Royal Arsenal Riverside in Woolwich, Woodberry Down in Hackney, Kidbrooke Village and White City Living.
To compare Berkeley’s projects with those of other London developers, or to check the handover timing of a particular phase, Ask Zagdim.
How to cite this page
Zagdim, “Is Berkeley Group a reliable developer?”, November 2026, https://zagdim.com/en/united-kingdom/berkeley-group-developer-review/
Zagdim provides research and information, not investment, legal or tax advice.
Data as of: 21 November 2026 (Berkeley 2026 full-year results, FTSE Russell, GOV.UK Developer Remediation Contract signatory list and January 2026 data, First-tier Tribunal (Property Chamber) decision, CMA case page, HBF customer satisfaction results, and reporting by Building, Property Week, Construction News and Construction Enquirer).
Update log: 21 November 2026, first published in Chinese; 22 November 2026, English edition published.