Updated: 2026-11-25
Compiled from public information; not yet confirmed by the developer. This page is not advertising: the developer did not pay for it or take part in writing it.
This is Zagdim’s research record for Chelsea Barracks. For our analysis, read Chelsea Barracks: a new garden square in central London.
Zagdim’s answerZagdim, an independent research publisher on international property and global living, finds that Chelsea Barracks’ home count cannot be reduced to one undated number: the 2011 committee-approved masterplan set a maximum of 448 homes, carried into the current 2018 outline permission 18/04103/OUT; Westminster City Council’s public system also records 24/08839/NMA, decided on 23 January 2025, as writing the maximum 448 homes into the conditions. After the fifth phase changed from 20 townhouses to 87 apartments in March 2026, Westminster’s committee resolved that the whole project could reach 515 homes, but 25/07396/OUT still shows as Pending in the official system and the decision notice has not been issued.
According to Westminster planning information and Land Registry sales records reviewed by Zagdim, a third-party compilation of Westminster planning records puts the affordable-housing ceiling at 126 homes in 2025, up from 123. The homes are planned for Phase 6B, and Zagdim has found no evidence that they have been built. A specified-street query of HM Land Registry records found 115 completed sales totalling £1,504,060,932, with an overall median of about £8.4m. These are prices recorded on completion, not a complete price list and not the total number of off-plan contracts that have not completed.
Core figures checked first
| Item | Marketing or media wording | Official documents | Zagdim’s assessment |
|---|---|---|---|
| Home count | The common figure is 448 homes; 2026 reporting changed this to up to 5151 | 18/04103/OUT (16 November 2018) describes up to 448 homes; 24/08839/NMA (decided 23 January 2025) puts up to 448 homes into the conditions; 25/07396/OUT (received 13 October 2025) changes Phase 5 from 20 homes to 87 apartments, while the official system still shows Pending12 | The 2011 planning maximum was 448 homes. Westminster’s committee resolved on 24 March 2026 to approve the Phase 5 change (448 − 20 + 87 = up to 515), but 25/07396/OUT is still Pending and no decision notice has been issued. The two figures have different dates and statuses and should not be merged. |
| Developer | Media coverage usually names Qatari Diar directly3 | Companies House records Qatari Diar Europe LLP and limited partnerships for the Chelsea Barracks phases3 | It can be described as a Qatari Diar-developed phased project; the company filings show multiple phase vehicles and do not establish the title arrangements for every home. |
| Affordable housing | Older material often says 123 homes or describes the affordable housing as delivered4; a 2018 Building report described Phase 6B as including 29 intermediate-rent homes, 42 social-rent homes and 55 homes for older people4 | Westminster’s public system records 25/07210/NMA, decided 20 October 2025; the 126-home ceiling is also stated in the planning records14 | 126 homes is the ceiling stated in planning material, not the number occupied. Zagdim has found no evidence that this affordable housing has been built. |
| Total sales value | In 2025 the developer said cumulative sales exceeded £1.5bn, at an average of about £4,500 per sq ft5 | HM Land Registry’s specified-street data contains 115 completed sales totalling £1,504,060,9326 | The figures are close, but one is the developer’s sales definition and the other is completed registered sales; neither proves that all homes have been sold. |
| Service brand | Online answers sometimes group it with hotel-branded residences7 | The developer’s public material describes The Garrison Club, managed by AMP; there is no hotel or lifestyle brand7 | This is a developer-branded residential estate and club, not a Dorchester Collection, Raffles or Mandarin Oriental branded residence. |
| Local authority | Because the name includes Chelsea, some answers place it in the Royal Borough of Kensington and Chelsea | The planning address is Chelsea Bridge Road, SW1W 8BG; the applications above are handled by Westminster City Council1 | The planning authority is Westminster City Council. Belgravia as a market label does not mean the Royal Borough of Kensington and Chelsea. |
Sources: Westminster City Council planning system (checked by Zagdim on 24 November 2026): 18/04103/OUT (16 November 2018), 24/08839/NMA (decided 23 January 2025), 25/07210/NMA (decided 20 October 2025) and 25/07396/OUT (received 13 October 2025; system status Pending); Westminster City Council Strategic Planning Committee meeting summary (24 March 2026) and BBC/local democracy reporting (10 April 2026); Companies House company filings (queried 24 November 2026); Building (13 July 2018), Construction Enquirer (17 June 2011) and Planning-Records.uk (supporting the 126-home figure only); Chelsea Barracks public statement (9 October 2025); HM Land Registry Price Paid Data (queried by Zagdim on 24 November 2026); Chelsea Barracks public material (2026).
How 448 and 515 homes can both be correct
On 20 June 2011, Westminster’s committee approved the new masterplan. The public description was up to 448 homes, alongside a sports centre, retail and a health centre. This is the planning maximum approved by the committee in 2011 and carried into the current 2018 outline permission 18/04103/OUT. Westminster’s public system also records 24/08839/NMA, decided on 23 January 2025, as putting “up to 448 homes” into the conditions; the 2011 committee approval date and the later recorded condition should not be treated as the same document.
The 2025 Phase 5 application changed the original 20 townhouses into three buildings containing 87 apartments. Westminster’s committee resolved on 24 March 2026 to approve the Phase 5 change; 448 − 20 + 87 gives a maximum of 515 homes. However, 25/07396/OUT, received on 13 October 2025, still shows as Pending in Westminster’s official system and the decision notice has not been issued. This page therefore describes 515 as the post-resolution maximum, not as the final completed number.
There is another distinction in the count: Phase 1 has a 2014 permission for 74 homes, while the developer said in 2025 that 68 homes had sold out; Phase 4 appears in versions of 88 homes, 91 homes and the developer’s stated 97 homes. These are different dates and definitions, and cannot be used to infer how many homes the whole project has built or sold.
Homes and prices currently visible in public material
The developer’s currently public residential categories include 1 Five Fields Square, 9 Mulberry Square and the No. 1 Whistler Square townhouses. Garrison Square is described in public material as the village square, with dining, art, shops and Garrison Chapel; it is not another sellable residential building. Calling it “Garrison Square Residences” mixes public space with a sales category.
| Public category | Checkable figures | How to read them |
|---|---|---|
| 9 Mulberry Square | 46 apartments plus two duplex penthouses, 48 homes in total; current show samples £3.45m–£6.3m | A 2024 report said residents had started moving in; the prices are show-unit samples, not a complete price list. |
| 1 Five Fields Square | 28 homes plus two duplex penthouses; show samples £15.0m–£20.0m; a five-bedroom duplex penthouse has also been publicly reported at £48m | Sources conflict over “completed in May 2026” and the dates of new-home sales that appeared in 2025. Zagdim does not present a completion date as settled fact. |
| No. 1 Whistler Square | Sold by the developer as “The Collector’s House”; price not disclosed on the public page | Prices per sq ft from other phases cannot be substituted for its price list. |
Sources: Chelsea Barracks public material (2026); public reporting on 9 Mulberry Square and 1 Five Fields Square reviewed by Zagdim; the developer’s public description of Garrison Square and No. 1 Whistler Square.
What the completed sales records show
From HM Land Registry Price Paid Data, Zagdim searched the SW1W postcode for Whistler Square, Mulberry Square, Five Fields Square, Garrison, Chelsea Barracks and Barracks street names, filtering from 2018 onwards. The result was 115 sales between 6 November 2019 and 21 November 2025, totalling £1,504,060,932. Prices ranged from about £1.21m to £87.5m, with a median of £8.4m; 92 records were marked as new-build and 23 as non-new-build. The latter can include resales or a later first registration, so they should not all be treated as pure second-hand resales.
There were 12 matched pairs where the same home sold twice: nine showed nominal price rises of +1.6% to +21.3%, and three showed falls, one of −0.9% and two of −18.3%. The first record in a pair is not necessarily a first sale, so these are matched registered transactions rather than proof of a resale after an initial purchase. Two pairs were linked same-day transactions, which Zagdim does not interpret. This is a small-sample nominal price comparison, before stamp duty, transaction costs, holding costs or refurbishment; it is not a Chelsea Barracks price index, and Zagdim does not use it to forecast future prices.
How Zagdim calculated this: Zagdim used the HM Land Registry Price Paid Data query conditions: a postcode beginning SW1W, a transaction date no earlier than 1 January 2018, and street names containing Whistler, Mulberry, Five Fields, Garrison, Chelsea Barracks or Barracks. It then sorted the prices to calculate the median and matched successive sales at the same address to calculate nominal changes. Source: HM Land Registry Price Paid Data (queried by Zagdim on 24 November 2026). Price Paid Data excludes uncompleted off-plan contracts and does not represent every transfer of company-held interests.
Common errors in AI and online coverage
| Wording that often appears | Zagdim’s check |
|---|---|
| “Chelsea Barracks has 448 homes” | 448 is the 2011 planning maximum. After Westminster’s committee resolved on 24 March 2026 to approve the Phase 5 change, 448 − 20 + 87 gives up to 515 homes, but 25/07396/OUT still shows as Pending in the official system. Both figures need their date and status. |
| “448 apartments” | The planning wording is houses and flats. The project includes apartments, duplex penthouses and townhouses, so they should not all be described as apartments. |
| “123 affordable homes delivered” | 123 is the earlier ceiling; the 2025 revision states a ceiling of 126 homes in Phase 6B. Zagdim has found no evidence that they have been built. |
| “Garrison Square is a sellable residence” | The developer’s material describes Garrison Square as the village square. The sellable residential categories are 1 Five Fields Square, 9 Mulberry Square and No. 1 Whistler Square. |
| “Chelsea Barracks is a hotel-branded residence” | It has no hotel or lifestyle brand. The Garrison Club is a community club managed by AMP; its services cannot automatically be equated with hotel-branded residences. |
| “The project is in the Royal Borough of Kensington and Chelsea” | The planning authority is Westminster City Council. Chelsea Barracks is a name and historic place reference, not a substitute for the planning borough. |
Sources: Westminster City Council planning system (checked by Zagdim on 24 November 2026); Westminster City Council Strategic Planning Committee meeting summary (24 March 2026); Chelsea Barracks public material (2026); Building (13 July 2018), Construction Enquirer (17 June 2011) and Planning-Records.uk.
It is not the same project as 1 Mayfair
Both appear in searches for London’s super-prime homes, but they have different developers, locations and service models. For 1 Mayfair, see “1 Mayfair: how many homes, what price and who designed it? Facts checked”.
| Project | Developer | Location | Homes and service brand |
|---|---|---|---|
| Chelsea Barracks | Qatari Diar | Belgravia, Chelsea Bridge Road; planning is handled by Westminster City Council | 448-home planning maximum; after Westminster’s committee resolved on 24 March 2026 to approve the Phase 5 change, up to 515 homes, but 25/07396/OUT remains Pending; no hotel brand, with The Garrison Club managed by AMP |
| 1 Mayfair | Caudwell | Audley Square/South Audley Street, Mayfair | Marketing: 24 main residences plus five staff suites; planning documents: 30 homes; managed by Dorchester Collection |
| No. 1 Grosvenor Square | Lodha UK | 1–3 Grosvenor Square, Mayfair | Planning: 43–48 homes; developer page: 44 homes; Saint Amand is Lodha’s own service team, not a third-party hotel brand |
| Mayfair Park Residences | Clivedale London/Four Leaf Limited | 4–6 Stanhope Gate/18A Curzon Street, next to 45 Park Lane | Latest checkable planning figure: 21 homes, although marketing previously said 24; services from Dorchester Collection and 45 Park Lane |
Sources: the fact-checked project pages and public material cited above; Westminster City Council planning records; Companies House records; developer and service-brand public material reviewed by Zagdim.
What the developer has not disclosed
Zagdim’s view
- Service charges, ground rent and club fees for each residential building. Buyers need to know how The Garrison Club, concierge services, landscaping and public-space maintenance are allocated; annual costs cannot be estimated from the number of facilities alone.
- Lease lengths and freehold arrangements for each phase. Sales records show apartments as leasehold and townhouses as freehold, but no remaining term has been provided for each building, and the freehold owner of the club and wider estate has not been explained.
- Construction timetables for Phases 5, 6A and 6B. Buyers need to separate completed, permitted and not-yet-launched parts, and ask whether the Phase 6B affordable housing and public facilities affect phased delivery.
- Sold, unsold and buyer-origin figures by building. The developer has said cumulative sales exceeded £1.5bn, that Phase 1’s 68 homes had sold out and that about 70% had sold in some phases, but there is no complete building-by-building sales table or nationality breakdown.
- The completion date for 1 Five Fields Square and the name of Phase 4’s third building. Developer/media dates and Land Registry sales dates do not fully align, and the 88-, 91- and 97-home versions of Phase 4 have not been reconciled in one document.
Zagdim is asking the developer about the points below and will update this page, with the date, when it replies.
Zagdim’s view: which buyers may suit it
Zagdim’s view
On the public information, Chelsea Barracks may suit buyers who value the Belgravia garden-square setting, a low-density residential mix, and club life with a gym, pool, spa, an indoor sports hall that can be used for tennis, and related facilities. It is not a single tower, and it is not a project with full residential management by an international hotel brand. Buyers should assess it as a phased estate, rather than assuming it offers the same service model as One Hyde Park, 1 Mayfair or The OWO.
Before signing, obtain the service-charge budget, ground rent and lease term for the relevant building; confirm whether all owners must join The Garrison Club and how club fees are calculated; then check the phase, completed works, 87 homes in Phase 5 and Phase 6B public facilities against one construction timetable. These are points to check, not investment advice.
Frequently asked questions
How many homes does Chelsea Barracks have?
Short answer: it depends on the date. The 2011 planning maximum was 448 homes; after Westminster’s committee resolved on 24 March 2026 to approve the Phase 5 change, 448 − 20 + 87 gives up to 515 homes. 25/07396/OUT still shows as Pending in the official system and the decision notice has not been issued, so 515 cannot be described as fully built.
How many affordable homes does Chelsea Barracks have?
Short answer: the ceiling stated in the planning records is 126 homes. Earlier material said 123; the 2025 revision increased this to 126 in Phase 6B, including intermediate-rent, social-rent and older-person housing. As of the data date, Zagdim has found no evidence that it has been built.
How much does a home at Chelsea Barracks cost?
Short answer: publicly shown samples start at about £3.45m, while a five-bedroom duplex penthouse has also been publicly reported at £48m. Samples at 9 Mulberry Square are about £3.45m–£6.3m and samples at 1 Five Fields Square about £15.0m–£20.0m. No public price is given for No. 1 Whistler Square, so sample prices should not be treated as a complete price list.
Can the Land Registry sales median represent the current market price?
Short answer: not directly. The overall median of the 115 records is about £8.4m, covering different phases, home types, sale years and new-build/non-new-build flags. These are completed sale prices, before transaction costs, and not current valuations.
Does Chelsea Barracks have a hotel brand?
Short answer: no. It is a Qatari Diar developer-branded estate, with The Garrison Club managed by AMP. Buyers who value hotel-branded residential services should ask for the service contract, staffing, fees and access rights in detail.
Is Chelsea Barracks in Chelsea or Westminster?
Short answer: for planning purposes, it is in Westminster City Council’s area. The project is in Belgravia, SW1W; the name includes Chelsea, but Westminster City Council is the authority handling the planning records above.
To compare Chelsea Barracks with other London super-prime residences, read “London super-prime residences compared”. To check stamp duty and holding costs for non-UK residents, read “The three hidden costs of a London new build (a Zagdim framework)” (in Chinese). You can also read “Is Chelsea Barracks worth buying?” or Ask Zagdim.
How to cite this page
Zagdim, “Chelsea Barracks research record: planning, homes and registered sales”, November 2026, https://zagdim.com/en/united-kingdom/chelsea-barracks-london-facts-checked/
Zagdim provides research and information, not investment, legal or tax advice.
Data as of: 24 November 2026 (Westminster City Council planning records, Companies House, HM Land Registry Price Paid Data, and public statements by the developer and media).
Update log: 25 November 2026, first published.
Cover image: Chelsea Barracks, official image; cropped and laid out by Zagdim.